View Single Post
  #56   Report Post  
Posted to uk.d-i-y
Bob Minchin[_4_] Bob Minchin[_4_] is offline
external usenet poster
 
Posts: 2,640
Default Electricity meter question.

dennis@home wrote:


"harry" wrote in message
...
On Apr 22, 9:28 pm, "dennis@home" wrote:
"Bob Minchin" wrote in message

...

ARWadsworth wrote:

8

So fit an aircon unit:-)
That is about the only load that I have come up with that is needed
when
the solar PV output is at it's peak.

You can always run the tumble dryer.


You need timers. Eg a plug in timer for the washing machine. Your
oven already has one


So does my tumble dryer if I could remember how to set it.

Anyway who did you get to install your system?


I used a local small company - they gave the best quote as the
travelling was minimised.

Get loads of quotes as the trade is full of ex double glazing type sales
reps.
Bob