Feeding solar power back into municipal grid: Issues andfinger-pointing
bud-- full-quoted:
A devastating analysis.
I am sure when the utilities read it they will stop paralleling
generators,
How many utilities connect the output of new parallel generating sources
to the 120/208 connection side of a grid, instead of at the sub-station
high-voltage side?
|