Thread
:
London Midland Scottish Locomotive General Repair Shop
View Single Post
#
4
Posted to rec.crafts.metalworking
Bob Engelhardt
external usenet poster
Posts: 2,473
London Midland Scottish Locomotive General Repair Shop
lid wrote:
... every task was timed out and scheduled to operate like a
industrial ballet ...
To the minute! There must have been SOME margin in there and some
contingency plan. What happens if one part is not ready - does the whole
line come to a grinding halt? No union, I bet.
Bob
Reply With Quote
Bob Engelhardt
View Public Profile
Find all posts by Bob Engelhardt