getting ready to tile the bathroom
bpuharic wrote:
On Sat, 8 Jan 2011 19:14:59 -0500, "Colbyt"
wrote:
"bpuharic" wrote in message
...
OK getting ready to put floor tile in the bathroom...what do i do
about running it up against the toilet and bathtub? obviously i
dont want to life either...do i just run the tile against the base
of the tiolet and bathtub, then caulk and seal?
thanks all
You pull the john or live with the mistake you made. Not pretty.
yeah had a feeling this would be the case. not too happy with trying
to pull the toilet. messy job, etc.
Turn off, and disconnect the water. Flush it with the water off to clear most of
the water. Unbolt it and lift it out. Or do it poorly.
|