View Single Post
  #63   Report Post  
Posted to uk.d-i-y
andrew andrew is offline
external usenet poster
 
Posts: 477
Default OT Electricity Generation

Andy Champ wrote:

The power will be limited by the low fall, and the flow of the Thames.



The power is a function of the flow times head. The cost tends to be
proportional to the mass of the equipment. Half the head and you double the
massflow for a given power, hence a high head low flow is far cheaper to
exploit than the opposite.

AJH