OT Electricity Generation
Andy Champ wrote:
The power will be limited by the low fall, and the flow of the Thames.
The power is a function of the flow times head. The cost tends to be
proportional to the mass of the equipment. Half the head and you double the
massflow for a given power, hence a high head low flow is far cheaper to
exploit than the opposite.
AJH
|