On 19/10/2010 08:55, Tim Streater wrote:
How much power is this project expected to produce?
What is it expected to cost?
What is its expected lifetime?
What are its annual maintenance and running costs?
Not much, to all the questions.
The power will be limited by the low fall, and the flow of the Thames.
But OTOH the weir will be there anyway; the moving parts are easily
accessible for maintenance; and there will be no silting problems that
aren't already being dealt with by the Thames navigation authorities.
I'd say do it. It won't help much, but it'll help.