View Single Post
  #58   Report Post  
Posted to uk.d-i-y
David Hansen David Hansen is offline
external usenet poster
 
Posts: 3,356
Default OT Electricity Generation

On Tue, 19 Oct 2010 09:51:14 -0700 (PDT) someone who may be harry
wrote this:-

The capacity of the plant has to be sized on peak loads not any
avaerges worked out.


The plant at Teddington Lock will undoubtedly be feeding into the
grid. As a result it does not have to be sized for peak loads, that
is something for the system operator to deal with.




--
David Hansen, Edinburgh
I will *always* explain revoked encryption keys, unless RIP prevents me
http://www.opsi.gov.uk/acts/acts2000...#pt3-pb3-l1g54