View Single Post
  #2   Report Post  
Posted to alt.home.repair
Ed Pawlowski[_2_] Ed Pawlowski[_2_] is offline
external usenet poster
 
Posts: 2,025
Default Radiator pipe over electric panel


"millinghill" wrote

If the electrical work passes, would the inspector cite me for a
violation of this existing condition (pipe over electrical panel) and
delay approval until I have the pipe moved?



Why not call him and ask? Most inspectors would rather clarify an issue
ahead of time rather than fail you at the inspection.