My old mother has just had a new consumer unit fitted (old one was rewireable fuses).
The old cables were not long enough, so some had to be lengthened via a block.
Does the sparky have to issue a full test cert for all circuits, as the cables were lengthened.
Was he right originally in saying that he could not install a new circuit, without a new consumer box being fitted.
--------------= Posted using GrabIt =----------------
------= Binary Usenet downloading made easy =---------
-= Get GrabIt for free from
http://www.shemes.com/ =-