Customer has had a shed base laid (not by me, I turned the job down) which
has turned into a bit of a disaster. Its off level by about an 1" in both
directions and the surface looks like a roller coaster for mice.
They want a metal shed erected on top, but there is no way thats going to
work until the base is sorted.
Initial thoughts are to erect level formwork & top the base with a little
more concrete.
Is it going to bond OK to the exciting base, especially where it
'feathers'.? Would PVA help?
--
Dave - The Medway Handyman
www.medwayhandyman.co.uk