Thread: Lo Volts
View Single Post
  #13   Report Post  
Posted to uk.d-i-y
Dave Plowman (News) Dave Plowman (News) is offline
external usenet poster
 
Posts: 43,017
Default Lo Volts

In article ,
ARWadsworth wrote:
If the houses were gas CH then an individual service could well be
looped to the next property, especially if the properties were
mirrored so the meter positions of adjoining properties are close
together. Distribution of phases along the main then becomes
R-R-Y-Y-B-B-B-B-Y-Y-R-R-R-R-Y-Y etc.


Looking at the lights that go off in a powercut on our street it seems
to be R-R-Y-Y-B-B-R-R-Y-Y-B-B etc The incoming supply runs down the
garden between a pair of semis, feeds one cut out and then feeds back
across the garden to the next semis cutout.


Is the looping normally visible - ie at the riser - or underground?

--
*Also too, never, ever use repetitive redundancies *

Dave Plowman London SW
To e-mail, change noise into sound.