Are Circuit Breakers Over-rated?
On Nov 4, 8:50�am, Jeffy3 wrote:
OP He So here is the $800 estimate:
Removing the existing 60-amp fuse box, meter socket �and service
cable.
Install a 100 �amp service with a 20 circuit panel
Run 30 ft. of 1-- amp service cable and install a new meter socket.
Install an 8 ft. ground rod and wire it to the panel.
Supply new connectors, straps, circuit breakers and a service head.
Mark the main appliances in the house.
Anything I should question? Thanks again
more breaker capacity is always a good thing.....
|