In article ,
Steve wrote:
I'm running 22mm Hep2o pipes from under a timber floor into a kitchen
with a solid floor. Because of the layout, the only way I can do it
is to drill holes at 30 degrees the horizontal (between the floor void
and the edge of the solid kitchen floor); where the pipes come out,
they are pointing upwards at 30 degrees, and I want them to then run
horizontally.
Use copper and bend it to suit. Then adaptors either end.
--
*Laugh alone and the world thinks you're an idiot.
Dave Plowman
London SW
To e-mail, change noise into sound.