Posted to sci.electronics.design,sci.electronics.repair,alt.engineering.electrical,alt.rec.crafts.metalworking
Jamie Jamie is offline
external usenet poster
 
Posts: 1,001
Default Liability & responsibility of electrician?

RoyJ wrote:



Assuming a nominal 240VAC supply, 245V is in no way "not correct" --
it's only about a 2% overvoltage.



And since there is likely no load in shop when the install was taking
place, the 245 would be a higher than normal reading.

But I question the use of "3phase" and "245 volts" in the OP question.
Around here, 245 volts would be perfectly normal for a single phase
circuit, very high for a "standard" 208/3 phase delta.

We still use 208 for ligthing only..