View Single Post
  #7   Report Post  
Posted to rec.crafts.metalworking
Wes[_2_] Wes[_2_] is offline
external usenet poster
 
Posts: 4,562
Default Cove radiant electric heating for my tool room

"John" wrote:

You dont want to have your iron chill down so it takes a half a day to bring
it up to a reasonable temp. I would try to seal up all the air leaks and
then set the thermostat to hold 45 deg. while you are not there. Think of
those machines as big ice cubes if they get cold. A hot air propane heater
will make your machines sweat and rust if it vents into the room. The high
efficiency gas furnaces that put out water are real nice if you can get one
cheap.



I'm building the room very tight and I'm using electric heat to keep any moisture issues
from happening. Since there is nearly two tons of metal in the room, I'm not going to be
able to cycle too low.

I've been playing with a couple calculators on the net and it looks like I could keep it
at 70F for 240 bucks a year if I plugged the right numbers in.

Wes