Geo wrote:
On Sun, 07 Jun 2009 22:42:43 GMT, "The Medway Handyman"
wrote:
If the holes in the brackets are drilled at 9mm, which would be
right for multi montis, then the proceedure would be to mark & drill
the top hole, insert the fixing loosely, check for level & mark the
other fixing points. Move rail aside then drill the other holes.
Makes more sense Dave - Ive never done a vertical railway before...
I was wondering what the application was as well :-)
--
Dave - The Medway Handyman
www.medwayhandyman.co.uk