View Single Post
  #5   Report Post  
Posted to alt.home.repair
DanG DanG is offline
external usenet poster
 
Posts: 1,066
Default Concrete Curing Time

A typical answer would be 7 day minimum for vehicles. I assume
they used curing compound and the proper subgrade compaction work
as done.
--
______________________________
Keep the whole world singing . . . .
DanG (remove the sevens)




"Gene Bleuler" wrote in message
...
I had a new 4" deep concrete driveway poured last week. How long
should I wait before I should drive my sedan on it? What about
allowing a small delivery truck (UPS/FedEx) to pull in?