Lateral thought - sarking
Man at B&Q coughed up some electrons that declared:
You *still* need to arrange for ventilation of the void between the
insulation and the sarking.
MBQ
Already have a plan for that - soffit vents at the lower end and dormer
fascia vents at the top (no need for ridge vents as dormer roof is within a
foot of the ridge). Need to ensure that all voids are interconnected for
free air flow, but BCO is happy with solution, although a bit
unconventional.
50mm gap under the sarking above celotex at all points.
Cheers
Tim
|