CU tails burried in plaster !
On Jan 26, 3:11*pm, jgharston wrote:
For a new installation, most RECs requires tails to be surface
mounted.
You have to jump through additional hoops to have them buried or
enclosed. IEE regs cover the wiring from the meter (or isolation
switch)
onwards.
--
JGH
Going to replace the tails as follows;-
Drill through wall immediatly below the CU then run the new tails
through the wall and down to the Meter box enclosed in trunking. The
Service supply (overhead cables) also run down the same wall
Comments ?
Andy
|