RM MS wrote:
Lew, that is the ideal answer. Except for the 5 grand
I was also wondering about the tubes for new pilings, why are they
better than an augered hole with a small 2×4 leveling form at the top
of each? Seems like they are smooth, and a auger hole is nice and rough
to lock the concrete to the soil better?
It's not a matter of locking the concrete in the soil. It's preventing
frost from heaving the pier. A smooth surface reduces this chance
provided the base is below the frost line.
--
Jack Novak
Buffalo, NY - USA