In article
,
Jonathan wrote:
I am planning to replace a worm-eaten floor with new tongue and groove
boards. In the past, these have shrunk after I have laid them. How
long should I wait to dry them out properly?
I acclimatised T&G softwood flooring destined for my bathroom for three
months before fitting. Still shrunk over the hot pipe runs. I'd guess a
decent hardwood would be better.
--
*If they arrest the Energizer Bunny, would they charge it with battery? *
Dave Plowman
London SW
To e-mail, change noise into sound.