"Christian McArdle" wrote in message
et...
This is a DHW only heat bank. So you will be having a diverter valve for
either CH & DHW, with the CH running directly from the condensing boiler.
My original intention was to use no diverter valve, just 2 ports on every
circuit. Now, I'm not so sure. I may install a diverter valve for the hot
water and use 2 port valves for the heating sub circuits.
What kW rating is the coil?
I don't know. However, the cylinder appears to be made by Telford, so I
might have a look to see what their standard coils are rated at. I suspect
it will be less than the boiler's maximum output, hence why I wasn't too
concerned about priority operation.
Coil areas:
80 litre Telford Typhoon cylinder has: 1.2 squ metres coil surface area.
120 litre Telford Typhoon cylinder has: 1.55 squ metres coil surface area.
Calculated to give 12-16 minutes recovery time.
125 litre Tornado unvented cylinder has: 0.704 squ. metres coil surface
area.
---
--
Checked by AVG anti-virus system (
http://www.grisoft.com).
Version: 6.0.520 / Virus Database: 318 - Release Date: 18/09/2003