Thread: Part P needed?
View Single Post
  #1   Report Post  
Posted to uk.d-i-y
Vass[_3_] Vass[_3_] is offline
external usenet poster
 
Posts: 3
Default Part P needed?

Hi
I intend to board the loft space, at the same time, change the wiring for
the upstairs lighting circuit.
I will run this along the top of the boards to a junction box where it will
meet the cable going down to the CU.
Not a big job, so does it fall under "notify council" "Part P" requirements?
TIA
--
Vass
'06 R1
www.doubleyolk.co.uk