View Single Post
  #54   Report Post  
Posted to rec.crafts.metalworking
[email protected] dcaster@krl.org is offline
external usenet poster
 
Posts: 3,984
Default Awright, McGiver types

On Dec 10, 5:19 am, "Harold and Susan Vordos" wrote:
The entire house will be done in
5/8" firecode board.

I'm slowly coming to the conclusion that I will be the lucky ******* that
will hang it---

At the rate I'm going, the house will take another four years.

Harold


If I were going to do a whole house in 5/8 drywall, I would certainly
buy a dry wall hoist. And rent it out after I was done using it.
Harbor Freight among others sell them.

Dan

95852-2VGA
Haul-Master 150 LB CAPACITY DRYWALL/PANEL HOIST $399.99
$249.99