View Single Post
  #1   Report Post  
Posted to uk.d-i-y
Graham. Graham. is offline
external usenet poster
 
Posts: 324
Default shower cubicle tileing

Unless the user is very careful indeed, water is dripping
through the bathroom floor/kitchen ceiling.
The bottom partial tiles were lose, being held only
by the bead of silicone sealant.
http://myweb.tiscali.co.uk/infoweb/shower.jpg
What little plaster was left intact I have chipped
away leaving this gap. What is the best way to
proceed? Is there something waterproof I should
be using to fill the void, and will this be the same
product that fixes the tiles back?
--
Graham

%Profound_observation%