On Nov 5, 11:51 pm, John Rumm wrote:
stevelup wrote:
If there is no existing PME arrangement, then it is probable that it
is not needed.


This is nothing to do with PME. If the house has metallic gas pipeing
then this must be included in the main equipotential bonding. This is
irrespective of the type of earthing arrangement of the supply.


I understand - sorry.

Steve