View Single Post
  #2   Report Post  
Posted to alt.home.repair
DonC DonC is offline
external usenet poster
 
Posts: 82
Default Basement Finishing - Framing Ledge


wrote in message
ps.com...
Am finishing my basement - have had it water-proofed, put a vapor
barrier on the walls, will insulate, etc. The problem I'm running
into is in the framing.

I have a ledge that runs around most of my basement (knee-wall/frost
wall??). It's 3 feet up and 23" wide.

|
____|
|
|
|

How do I frame this? Some ideas I've had involve a single top/bottom
plate with the 2X's cut at 45-degree angles - or joined at 90-degree
angles. I really don't want to have two top/bottom plates unless I
absolutely have to.


Is this an old house with the basement added? In Michigan it's called a
"Michigan Basement." The footings are below the outer wall down 3 or 5
feet below grade depending how far north you are.