subpanel selection
I'm finishing my basement. I will be using 2 circuits for lights
(about 15-16 lights total), 1 for outlets, 1 for sewage pump, 1 for
bathroom GFI outlet, and 1 for general other stuff (e.g, bathroom
exhaust fan). If there's a better way, please let me know. I'm
leaning the way of the subpanel now, but I'm going to be doing
everything myself, provided the electrical permit I pulled already can
be amended to include the subpanel to replace the longer home runs.
So since I'm doing it myself, there's no real "Labor savings", other
than my own time. Thanks again!
|