View Single Post
  #11   Report Post  
Posted to rec.crafts.metalworking
Nick Mueller Nick Mueller is offline
external usenet poster
 
Posts: 344
Default Mill choreography

Tom Gardner wrote:

This
by changing the way I do my drawings and visualizing all the operations
with the thoughts of reducing set-ups


There are many different ways to make a drawing with different ways to how
to place the dimensions.
For manufacturing
For functional checks (in the pre-CAD times)
For structural analysis
For quality checks


Nick
--
The lowcost-DRO:
http://www.yadro.de