View Single Post
  #1   Report Post  
Posted to uk.d-i-y
tonyjeffs tonyjeffs is offline
external usenet poster
 
Posts: 14
Default Bricklaying tips, advice

My brickwork is passable but only just.... I have some basic questions
I'm using a 3:1 mix.
The engineering bricks I'm using have 3 large holes straight through.
Should I be filling these with cement as I go along?
Should I lay excess cement on each course so there is enough sticking
out to point up? If I do this it tends to dribble.
Or should I point afterwards with a dry mix. I can do it better this
way, but I can't get smooth flowing lines to my pointing because it's
too dry. If i make it wetter, it'll stain the brick surfaces.

So my problem is one way or the other, how to get a nice finish to my
pointing without staining the outer brick surfaces.

Any tips & advice appreciated.

Thanks
Tony