View Single Post
  #5   Report Post  
Posted to alt.home.repair
DanG DanG is offline
external usenet poster
 
Posts: 1,066
Default Hanging interior doors--where are the carpenters!

Doesn't sound to me as if you have ever framed a wall. Framer has
no reason to ever plumb the sides of the jambs, especially in the
plane of the closed door. You are always thankful if they plumbed
the hinge side of the jamb before they cut out the bottom plate.
As you hang the door, you will probably notice that very slight
adjustments from plumb really show up once the door is swung, and
herein lies most of the key to the solution. A good swat or two
in the right place with a scrap block and hammer can bring the two
jamb legs into plane. You can develop a system of crossing a dry
line tied off on diagonal corners of the jamb. When the strings
touch at the center of the "X" the legs are in plane, may have
nothing to do with plumb. That's part of the reason for the label
"trim carpenter', it demands the ability to make an installation
both function and look right. 2x materials vary in thickness and
straightness, plaster and lath certainly varied in thickness, but
even drywall installed across framing lumber can result in
variations in the thickness of the finish wall. The problems
multiply when it's a steel jamb in a poured concrete wall. What
length level are you using to determine plumb of the jamb or
wall??? I've known plumbers who swore by a 9" torpedo on a 20'
stick of pipe - don't ask.

--
______________________________
Keep the whole world singing . . . .
DanG (remove the sevens)




"edee_em" wrote in message
...
What i thought. Guess it's pretty common for them to have a
name for it. What happened to pride in one's workmanship? Can't
level a 30" door opening--should they be framing a house?????

Thanks Marson

"marson" wrote in message
oups.com...
On Aug 5, 11:40 am, "edee_em" wrote:
So the problem is this: I'm replacing my interior doors and I
fine the door
openings are way off level, both vertically and horizontally.
When i put
the replacement jamb in the opening level, it protudes away
from the wall in
some places and in others it sits back from the wall. So I
thought, follow
the wall. Now, after hanging the doors I'm noticing that the
door edge
doesn't line up with the jamb, vertically, at the strike plate
side. For
example, at one door I have, the top of the door is about 1/2"
deeper than
the jamb edge and at the bottom it is flush. I put the level
on the door
and of course it is level. I haven't done anything pecurliar
with the doors
(hinged where they wanted me to, etc). Is this typical? Is
there a fix?
Should I just force the door into flush with the door stop?

Thoughts appreciated.

--
edee em
I know the truth is out there but I like to stay in...


This is known as a "cross-legged" opening. Your jambs have to
flush
with the surface of the walls or your trim will be a nightmare.
The
only exception might be if the door is stuck in a corner where
you can
have the jamb hanging over 1/2" from the surface of the wall
and after
the trim is on this won't be noticable. Anyway, what I usually
do in
this case is to pull the door stops off and reapply them so the
door
hits the stop evenly. Not much you can do beyond that--trying
to make
a silk purse out of a sows ear!