Andrew Mawson wrote:
Essentially yes, but the lead flashing should be retained with a
'mouse' of lead at regular intervals - say 9". The 'mouse' is a 1"
strip of lead bent double or treble to make the height of the mortar
joint, and firmly squashed in with a bolster chisel & hammer so that
it forms into a very tight lump jamming the flashing physically into
the wall.
Although this won't stop the local pikeys nicking it - or at least
it didn't on a local industrial estate.
Like I said before, dodgy place Gravesend !
Agreed - but I don't live in Gravesend!
--
Dave
The Medway Handyman
www.medwayhandyman.co.uk
01634 717930
07850 597257