View Single Post
  #9   Report Post  
Posted to uk.d-i-y
Jim Alexander Jim Alexander is offline
external usenet poster
 
Posts: 244
Default New Gas Boiler and CH Maintenance (quote details)


"Vista" wrote in message ...
Boiler is a Ideal W RS 450 (Stellard Group).


Quote (EDF):
de-sludge
remove existing boiler, hot water tank, unnecessary piping, close flue
hole
fit new boiler (Vaillant Ecomax PRO 18E + fan assisted vertical flue
each radiator to have new chromium Belmont Terrier Lockshield valve
new tank 117L pre-lagged copper indirect cylinder
21mm plastic condense pipe
install one Blackerloy anti-corrosive thermo 3kw immersion heater and
power supply
ACL LP 722 digital programmer
supply Grundfos 15-50 variable head pump (to new cylinder)
supply and fit RF2 24 hour wireless room thermostat
cylinder thermostat - to control temp of hot water (in conjunction with
hot water cylinder
Honeywell three port controlling motorised value
13 amp switched fuse spur adjacent to boiler
heating circuit to be reconnected (BSS 2871X copper) - pipework in in
cupboard areas to be lagged in climatube poly lagging
system filling with Sentinel x300 and cleaned, then Sentinel x100
inhibitor added. Refill system , balance and test
£3,600

Now you've got at least one fairly comprehensive quote. Get some more and
eventually you will have the market price for somebody doing the job for
you. The EDF one doesn't seem bad considering the non-combi scope.
Bechmark it against BG and an independent. You may be able to find cheaper.
Only you can decide the value of going with a big name.

( I assume its you that has omitted the TRVs)

Jim A