The NEC doesn't require it, but some local jurisdictions do




"Boden" wrote in message
...
Is it required that I run rigid conduit inside a building from the meter
base to the entrance panel? The run from the meter to the entrance panel
will be at least 20 feet. Locating this outside the building would be
very difficult.

Thanks,
Boden