On Mar 26, 10:00 am, Bob Morrison wrote:
In a previous post Michael Bulatovich wrote...

Only the first 'circumstance' is legal in Ontario. Review for code
compliance is not the only type of responsibility that the stamp signifies.
It is also for "responsible control" of the design


Michael is correct when it come to the law in most states in the US. As I
said in another post, that is why I won't stamp drawings prepared by
someone else under any circumstances, unless that person is under contract
to me to to produce the drawings, I.e., a drafting service.

--
Bob Morrison, PE, SE
R L Morrison Engineering Co
Structural & Civil Engineering
Poulsbo WA
bob at rlmorrisonengr dot com



So are shop drawings, sprinkler plans, and such considered to be
produced under your supervision and control? Often they are not
stamped when the leave the shop.