View Single Post
  #1   Report Post  
Posted to alt.home.repair
Jack Jack is offline
external usenet poster
 
Posts: 31
Default Drywall install question

I am installing sheetrock vertically. Where the tapered seams meet, they
are falling on the center of the studs. When I attempt to screw down the
sheetrock at the seams, I am getting blowouts. Is there some sort of trick
or recommendation you have used to prevent this, other than using blocking?
I am trying to stay as far away from the edge as possible, but then I miss
the stud.
Thanks.