Mud bottom of drywall?
Noozer wrote:
"# Fred #" wrote in message
. ..
On new installation do you level out the bottom 4" of the sheetrock
flat to match with the rest of the surface for the new base molding?
Why not just split the sheet down the middle and put the cut edge to
the floor/ceiling?
Then you have two seams 4' apart. I would have gone vertical with the joint
to not have the taper at the bottom.
Rich
|