View Single Post
  #7   Report Post  
Posted to alt.home.repair
Pete C. Pete C. is offline
external usenet poster
 
Posts: 6,746
Default critique my circuiting plan

N8N wrote:

Pete C. wrote:
N8N wrote:

My (detached) garage does have a 100A sub panel in
it but about half my basement is still unfinished and I am undecided if
that should be a secondary workspace or not... I think the financial
department wants to turn part of it into a bathroom though which would
be kind of a PITA what with the sewer being buried under the concrete
floor and all.

nate


It's not a PITA, it's a shopping opportunity. New angle grinder and
abrasive wheel or circular saw and diamond wheel to make the cuts in the
concrete. Perhaps some new chisels and a sledge hammer...

Pete C.


LOL maybe you're right, but I'm unclear on who's going to pay for all
that stuff... I get the "you have too many tools already" lecture
quite regularly, most recently when I went out and bought a new Sawzall
(although it made cutting the old ceiling box out of the kitchen a
piece of cake.)

nate


If you're getting that lecture either you aren't doing enough of her
projects or you need to dump her.

Pete C.