Grandpa wrote:
wrote:
I'm about to start pulling the old galanized pipe in my 40 year old
home. I plan to remove only the main lines and leave the vertical
sections that lead to fixtures.
I would physically run the PEX to at least one bathroom before starting
the project.
Rethreading may be a disaster,
try to have one servicable bathroom befiore distrubing everything else.
PEX can hang in the wall safely with minimum of support