Floor & wall tiling
I am tiling the floor & walls to a shower room. I have read it is
better to tile the walls first, mainly to keep any mess off the floor
tiles. However, I need to place the shower tray at a precise level in
order that the front panel will fit without a gap. I propose to tile
the floor first therefore. Is this the correct proceedure?
|