View Single Post
  #4   Report Post  
Posted to uk.d-i-y
Stuart Stuart is offline
external usenet poster
 
Posts: 328
Default How many hours will it take me to sand floorboards in standard size room?

On 30 Nov 2006 04:55:15 -0800, wrote:

I'm planning to sand the floorboards in our dining room this weekend
and would like to get my wife and baby out of the house while I'm doing
the sanding but have no idea how long it will take?

I've got everything prepared, room cleared, all boards screwed down
etc.

I want to sand the floorboards first to get rid of the top layer of
dirt etc and then sand a second time to collect the sawdust to fill the
gaps between the floorboards. I will mix this with some special glue
like liquid (which I'm getting from sanding shop) and allow to dry
overnight. I will then do the final sand on Sunday using 2/3 different
grade sandpapers.

The room is about 12 foot by 12 foot.

Obviously they only need to be out while the sanding is going on, not
while I'm filling the gaps.


I have had 3 rooms ...LR/BR and Hall done in my flat by a commercial
organisation and the hall and bedroom being smaller were completed in one day .

The Living Room took until the second day but that didn't include gap filling
that you are doing and they are used to doing this sort of work . The smell of
the 2 pack they used was the worst thing and I certailny wouldn't have allowed a
baby in to the flat .It was bad enough for me and I went out for fresh air when
it was being done until the smell abated a bit .

I would have thought two full days in your case .


Stuart