View Single Post
  #4   Report Post  
Posted to uk.d-i-y
The Natural Philosopher The Natural Philosopher is offline
external usenet poster
 
Posts: 9,045
Default Sand and cement screed - how long to go off

F wrote:
I've got a small cloakroom floor consisting of concrete blocks with an
up to 2" covering of sand and cement. How long do I have to wait before
I can drill and plug it to install a studded partition?

TIA.

At least 24 hours, 60 preferably. depending on temperature