Embarking on a total replumbing the house (2 bathrooms,2sinks and a
toilet/washbasin) in conjunction with a new boiler & heat bank. Looking at
the logistics of the job I'm atrracted to the idea of using a hot and a cold
manifold with outlet valves. A search of the group archives only has "CH
with manifold" references. The pdf at
http://www.marleyplumbinganddrainage...tor_design.pdf
talks up the system. Has anyone either direct experience or any comments on
the benefits/drawbacks of the system?
PeterK