Default Need help with math for roof pitch


wrote:
On 30 Aug 2006 04:36:38 -0700, "marson" wrote:


wrote:
I am making a homemade truss for an addition to an existing barn. I
have never been any good at math. The barn roof was built to be a
4/12 pitch. The barn walls are 107 1/2 inches outside front to
outside rear. I measured the existing rafters, and they are 113 3/8
inches long from the highest part of the rafter (at the peak). I used
an angle tool (tool to set to the same angle and transfer it to a
board), and I cut the boards at the same angle. OK, I transferred the
angles to the boards and cut them the same. Then I loosely nailed a
piece of plywood across these 2 planks where the angles meet (at the
ridge). I left the lower ends (overhang) a little long to adjust the
height, so it's right. That's where I get puzzled. I want to be sure
the height is the same. How do I figure this out mathematically, or
am I better off just stretching a string across the existing roof at
the top of the walls, then measuring from the peak to the string, and
moving the string to the homemade truss, and make sure the height from
string to peak is the same, before I nail the horizontal board across
the truss.

If this was an outside wall, it would be fairly simple to make a 2x4
from the top of the wall to the peak, and be sure its the same as the
existing roof. However, this truss is being placed from pole to pole,
in the middle of the barn.

If I am not exactly clear, here is what I am doing.
I bought and moved an existing pole barn. To move it, I cut it in
half because it was too large to pull down the road in one piece. I
now have both halves. One half is in the ground, the other half is
still on the wagon frame that I used to move it. I am adding on to
the barn as I put it back together. But I am adding in the middle.
I dont plan to put the half still on the wagon into the ground until
the new portion in the middle is built. The reason for that is so I
can shift around the other half in their (oversized) post holes until
the steel roofing and siding sheets fit together properly.

The reason I am telling all of this, is because I can not just run a
string from the roof of one half to the roof of the other. I wish it
was that easy......

Yes, this has been a complicated ordeal, but it will work out in the
end......

Thanks

Mark


oh yeah, you're the guy putting two halves of a pole barn together!
the height is staightforward: half the span times 4 divided by 12,
plus add in the heel height. however, i would not rely on math to try
to match existing--pull a sting and measure.


Thanks for the help. Now I can do some calculating. However, I did
sort of think the string/measuring method was the solution. The only
reason I got into the pitch math was because I have been a bit puzzled
about this, and I stopped over by the guy I got the barn from. He
built this barn about 2 years ago, so he remembered immediately the
pitch. But he did say the measurements could be off a little. I
already knew that, because the one end of the barn is about an inch
and a half wider than the rear 2x6 under the roof is about an inch
longer than the front one. When I told him that I noticed the slight
difference in width he said they just put a string across the peak and
cut the boards to match. So, I measured the trusses on either side of
the poles where I put the new one, There's about 3/4 of an inch
difference. So, I figure if I make the new one 3/8 of an inch higher
than the shortest one, I should be good.

I already know someone is going to ask why he sold a 2 year old barn.
It's because he put up a huge barn now, with a riding arena and all
sorts of fancy stuff. The barn I got from him was right in front of
the main door on the new barn, so he was going to salvage the steel
siding and demolish the rest of it. I paid him for the steel and got
the rest of the building for removing it. That was a good deal for
me, and saved him the time and cost to demolish it.

Thanks for your help.

Mark


mark, since it is hand framed, to really dial it in, first string a
horizontal string between the two wall plates. then hang a plumb bob
off of the peak, and measure to this from the outside of your wall from
both directions (since the peak isn't necessarily in the center. then
measure up from the horizontal string to the peak. if you have a flat
place, you can snap out this triangle on the floor and build the truss
to it. it'd be nice if the walls were level side to side. good luck.