Anyone do "flash tests" ?
That is outside of original manufacture.
Applying 1.5KV ac or even 3KV between tied (live and neutral) to earth and
pass level of leakage maximum of 3mA.
I would assume leakage between primary and secondary would be extremely
common and fatal to any circuitry further down line. Highly dangerous to
operative as well no doubt.
|