View Single Post
  #1   Report Post  
Posted to alt.home.repair
[email protected] wipeout64@hotmail.com is offline
external usenet poster
 
Posts: 12
Default Contract fell thru - need advice

It turns out the contractor we hired to paint our house is unreliable.
He managed to get the primer on and some of the trim. The problem is
that the can states that the top coat must be put on within 30 days. Is
it absolutely necessary to stick to 30 days time limit? What would
happen if it is 1 or 2 weeks over?