View Single Post
  #12   Report Post  
Posted to alt.home.repair
dkarnes dkarnes is offline
external usenet poster
 
Posts: 9
Default how long does refinishing floor take to dry?

Mike wrote:

This is in the northeast region (Boston) and it's a 20x13 space oak strip
floors.

A contractor said 1 day to sand and finish and 2 days to dry. I'm wondering
if he's being optimistic in 2 days of drying since it's been very humid here
lately. I'm wondering if it will still be too soft to move furniture on to
it on the 4th day since thats my moving (into ) day.

Thanks


i had water base put on a bedroom floor. i waited 7 days to put
furniture back in. read the label of product, it will tell you how
long it takes to cure.