Default OT - High-mix and low-mix concrete

This is somewhat speculation, and some bit of foggy memory so somebody that
really is up on this feel free to disabuse me.

From what I understand the engineers needed one monolithic block of concrete
when all was said and done so the lower portions were blended to cure real
slowly so the end result would be no seams. Also the lower part of the damn
is much thicker than the upper part but the concrete mixture had to be
adjusted to maintain a steady cure rate and the thinner sections having less
cross section had to be a hotter mix than the lower part because the heat
generated from the chemical reaction was disapated faster in the thinner
sections.

--
Roger Shoaf

If knowledge is power, and power corrupts, what does this say about the
Congress?


"Jim Stewart" wrote in message
...
I just finished a book describing the building
of Boulder Dam, and there's something I don't
understand. The book mentioned that two concrete
batch plants were made, one to product "low-mix"
concrete for the lower portions of the dam and
another to produce "high-mix" concrete for the
top.

The two plants were not run at the same time.
Any ideas as to why they needed two separate
plants and what the difference in the concrete
was?