View Single Post
  #13   Report Post  
Posted to rec.crafts.metalworking
 
Posts: n/a
Default fire proofing shop

Hi Bruce

Upon reflection I think you are right. I hate the idea of all the
plaster dust around my machines, but I will just have to tarp
everything up. Part of my problem is that I haven't gotten the framing
or electrical inspections done yet. What I should really do is do the
work required to pass the inspections first (get engineering drawings
stamped for the gambrel roof framing, make the stairs to the top floor
etc.)

stan