View Single Post
  #3   Report Post  
Posted to rec.crafts.metalworking
Pete C.
 
Posts: n/a
Default fire proofing shop

wrote:

I have built a two story 30' x 40' stick framed shop. The main floor
is separated into two sections, one which I plan to insulate, houses my
machine tools, the other I use for welding, car repair etc. Niether
area is panelled yet and I tying to decide how I should go about it.
My current idea for the welding area is to cover the lower 48" with
cement board ($30 for a 4 X 8 sheet) and the remainder with Aspenite
covered in flame retardent paint ($11 for a 4 x 8 sheet). I do not
want to use drywall because I do not want to tape it and it will get
all bashed up. Does anyone have an opinion on the flame retardent
paint?

stan


Use 5/8" type X drywall and top it with FRP paneling. Don't bother to
tape the drywall and offset the seams of the FRP from the drywall seams.
All fire rated, durable and fully washable as well.

Pete C.